Computer Aided Design Designer
$25.00 - $42.00 per hour
Apply (opens in a new tab)Computer Aided Design Designer
Posted yesterday
SENIORITY
Senior
SALARY
$25.00 - $42.00 per hour
About the role
- Develop and modify engineering drawings using AutoCAD and Autodesk design tools
- Create detailed design packages based on engineering markups and project requirements
- Perform drafting support for transmission and utility infrastructure projects
- Assist with PLS-CADD modeling activities for transmission line design projects
- Support early-stage project design development under engineering oversight
- Incorporate revisions and design updates throughout project lifecycles
- Collaborate with engineers, designers, and project teams to ensure accurate deliverables
- Maintain drawing quality, standards compliance, and documentation accuracy
- Support renewable energy and utility-related project initiatives
- Work independently while managing multiple project priorities
- 5+ years of CAD drafting and design experience
- Advanced proficiency with AutoCAD
- Experience using Autodesk design software
- Hands-on experience with PLS-CADD (required)
- Experience supporting utility, transmission, power delivery, or related infrastructure projects
- Ability to interpret engineering markups and develop detailed design drawings
- Strong understanding of drafting standards and engineering documentation
- Ability to work independently with minimal direction
- Strong communication and collaboration skills in a remote environment
- Utility transmission line design experience
- Experience with wood pole and steel pole transmission projects
- Structure spotting experience
- Exposure to renewable energy projects
- Understanding of power delivery engineering workflows
- Familiarity with early-stage transmission design packages
- Why This Role Stands Out
- Clear path to grow into a Transmission Designer role (especially with PLS-CADD exposure)
- Exposure to high-voltage infrastructure and renewable energy projects
- Work on large-scale, impactful projects supporting grid expansion and data center growth
- Strong, collaborative team environment with experienced engineers
- Stable and growing project pipeline
Before you apply
Applying takes about a minute. These four things decide how fast it moves after that.
Your profile is current
It's what we read first. Occupations, seniority and locations matter more than a long history.
Two examples you can talk through
Not a portfolio — just two pieces of work where you can explain the decisions and what you'd change.
A number in mind
What you're on now and what would make you move. We negotiate better when we know both.
Your notice period
Employers plan around it, and it's the question that stalls offers most often.
Once you apply, someone reads it and calls you before anything reaches the employer — usually within two working days.
