ELECTRICAL CONTROL PANEL BUILDER

Posted 17 days ago

monroe environmentalMonroe City (MO)

SENIORITY

Senior

Apply

About the role

Job TitleWE ARE HIRING FOR 2ND SHIFT: 4:45 PM - 1:15 AM MONDAY-FRIDAY
Position Summary:
  • Responsible for the assembly and wiring of electrical components in an electrical control panel for the successful operation of air pollution control and water treatment equipment.
  • Duties Include But Not Limited To:
  • Install electrical wiring and assemble components according to blueprints and electrical diagrams.
  • Assemble electrical panels according to wiring
and tap holes in specified locations for mounting control units, push buttons and other devices using hand tools, drills and other applicable tools. Attach breakers, relays, contactors, bus bars, transformers, push buttons, HMI screens, meters, plugging devices and fuse blocks to mounting holes with bolts and screws using wrenches, screwdrivers, and nut drivers. Cut, bend and form conduit pipe and tubing used to connect circuits and sub-assemblies. Connect color coded wires, and crimp to wire ends. Additional Education, Skills, and Experience:· High school diploma· 3-5 years wiring industrial equipment and/or equipment panels· Ability to read blueprints· Hilo experience.· Commitment to safety

Before you apply

Applying takes about a minute. These four things decide how fast it moves after that.

Your profile is current

It's what we read first. Occupations, seniority and locations matter more than a long history.

Two examples you can talk through

Not a portfolio — just two pieces of work where you can explain the decisions and what you'd change.

A number in mind

What you're on now and what would make you move. We negotiate better when we know both.

Your notice period

Employers plan around it, and it's the question that stalls offers most often.

Once you apply, someone reads it and calls you before anything reaches the employer — usually within two working days.

More like this