Skip to main content

Electrical Engineer III or IV-Physical Substation

Posted 49 days ago

sterling engineeringMinneapolis (MN)

SENIORITY

Senior

SALARY

$108,700 – $146,700

Apply (opens in a new tab)

About the role

Job ID: Na393293728Location: Minneapolis, MN
Job Type: Permanent
Pay: $108700 - $183800
Posted: 2026-07-28
Title: Engineer III / Engineer IV – Physical Substation
Location: Minneapolis, MN (Preferred) | Denver, CO | Fargo, ND | San Antonio, TXHire Type: Direct
Compensation: Engineer III: $108,700 – $146,700 Engineer IV: $122,500 – $183,800
Benefits:
  • Medical, Dental & Vision Insurance 401(k) with Generous Company MatchProfit Sharing
  • Paid Time Off & Paid Holidays
  • Employer-Paid Life, AD&D & Disability Insurance
  • Tuition Reimbursement
  • Adoption Assistance
  • Mental Health & Work-Life Resources
  • Gym Membership Discount Program
  • Career Growth with a Top EPC Contractor
About the Opportunity: Our client is seeking an Engineer III or Engineer IV – Physical Substation to support the design of utility-scale substations for renewable energy and battery storage projects up to 500 kV. This role offers the opportunity to lead physical substation design efforts, collaborate with multidisciplinary engineering teams, and work with some of the largest utility customers in the United States. Candidates will be considered at either the Engineer III or Engineer IV level based on experience.
Key Responsibilities: Design medium- and high-voltage utility substations for renewable energy, battery storage, and transmission projects up to 500 kV.Develop physical substation layouts, equipment arrangements, and detailed engineering design packages. Coordinate with Design Phase Managers, Project Managers, and multidisciplinary engineering teams. Perform engineering calculations, technical studies, and QA/QC reviews. Develop technical specifications and fabrication/construction packages. Review and evaluate vendor quotations and equipment selections. Provide technical support for proposals, procurement, construction, and field activities. Mentor junior engineers and provide technical leadership on large design projects. Verify construction activities comply with engineering drawings, standards, and safety requirements. Support multiple projects while maintaining schedules, budgets, and quality objectives.
Qualifications / Requirements: Bachelor's Degree in Electrical Engineering (BSEE) or related ABET-accredited engineering program. Experience designing utility-scale substations, power systems, or renewable energy facilities. Strong understanding of substation design principles, QA/QC procedures, and engineering standards. Experience with engineering calculations, design optimization, and technical problem-solving. Excellent written and verbal communication skills. Ability to travel up to 30%.Engineer III4+ years of related engineering experience. Professional Engineer (PE) license required. Strong understanding of discipline-specific technical designs, QA/QC procedures, and engineering policies. Engineer IV7+ years of related engineering experience. Professional Engineer (PE) license required. Demonstrated experience leading projects and mentoring engineering teams. Strong understanding of discipline-specific technical designs, QA/QC procedures, and engineering policies. Software AutoCADCDEGSBluebeamProcoreMicrosoft Excel Qualified applicants will receive consideration for employment without regard to race, color, age, religion, sex, sexual orientation, gender identity, national origin, disability, protected veteran status, or genetic information.

Before you apply

Applying takes about a minute. These four things decide how fast it moves after that.

Your profile is current

It's what we read first. Occupations, seniority and locations matter more than a long history.

Two examples you can talk through

Not a portfolio — just two pieces of work where you can explain the decisions and what you'd change.

A number in mind

What you're on now and what would make you move. We negotiate better when we know both.

Your notice period

Employers plan around it, and it's the question that stalls offers most often.

Once you apply, someone reads it and calls you before anything reaches the employer — usually within two working days.

More like this