Senior Electrical Engineer - Power Generation
Senior Electrical Engineer - Power Generation
Posted yesterday
SENIORITY
Senior
About the role
- Master's degree in Electrical Engineering or Control Systems Engineering with an Electrical Power emphasis
- Professional Engineer (P.E.) license in Texas or ability to obtain reciprocity 15+ years' experience in electrical power generation and renewable energy design
- Field experience, including startup and commissioning, experience
- Experience in renewable energy (PV, BESS, etc.) and DER or "microgrid" projects is highly desired
- Previous experience with an engineering power consulting firm desired
- Willingness to grow into a team lead or section manager role
- Strong leadership skills with the ability to work independently, as a lead on a multi-discipline consulting team, or as a lead on a small team are required
- Extensive knowledge of three-phase electrical power, protection and control design and settings development, system grounding, physical design, and experience with other activities such as lighting and grounding design, including instrumentation and control and life safety systems
- Instrumentation and Controls experience particularly with DCS and PLC systems is a plus
- Work with Project Manager and Project Controller on project reviews with management as neededDirect the activities of other engineering professionals and act as a mentor to other staff members as needed
- Work with Project Manager and Project Controller on project reviews with management as neededDirect the activities of other engineering professionals and act as a mentor to other staff members as needed
- An attitude and commitment to being an active participant of our employee-owned culture is a must
- Position will include an expectation of less than 10% travel for meetings with clients and vendors as well as project site visits
- Required Qualifications Bachelor's degree in Engineering
- A minimum of 10 years of experience
- Requires professional engineering license recognized by the licensing board for the location of the position offered. Example: Professional Engineer (PE or P.Eng) license.
- Extensive experience in project execution within the Power Market Sector
- Proficient computer skills in Microsoft Office as well as standard Power Market Sector design software (examples include PLS CAD, AutoCAD, Plant 3D, AutoPipe, and Revit)
- An attitude and commitment to being an active participant of our employee-owned culture
- What We BelieveHDR is our company. Together, we build on each other's life experiences and perspectives to make great things possible every day. This shapes our collaborative culture, encourages organizational trust and connects us closer to the clients and communities we serve.
- Our Commitment
Before you apply
Applying takes about a minute. These four things decide how fast it moves after that.
Your profile is current
It's what we read first. Occupations, seniority and locations matter more than a long history.
Two examples you can talk through
Not a portfolio — just two pieces of work where you can explain the decisions and what you'd change.
A number in mind
What you're on now and what would make you move. We negotiate better when we know both.
Your notice period
Employers plan around it, and it's the question that stalls offers most often.
Once you apply, someone reads it and calls you before anything reaches the employer — usually within two working days.
