Skip to main content

Director of Interconnection

Posted 5 days ago

talismanSioux Falls (SD)

SENIORITY

Manager

Apply (opens in a new tab)

About the role

Director, Interconnection Confidential Search | Talisman Advisory Partners Our client is a growing grid infrastructure and renewable energy development platform backed by one of the world’s largest infrastructure investors. They’re building out their interconnection function in North America and are looking for a senior interconnection leader to own the strategy and execution of generation and storage interconnection across a growing portfolio. This is a fully remote role.
What You’ll Do: You’ll lead the interconnection strategy for a portfolio of utility-scale solar, wind and battery storage projects, taking them from early site screening through queue entry, studies and executed interconnection agreements. You’ll identify viable points of interconnection and assess available capacity and upgrade cost exposure to shape where and how the company develops. You’ll manage interconnection requests and study processes across multiple ISOs and RTOs, interfacing directly with transmission providers, utilities and grid operators to resolve technical and commercial issues. You’ll review and challenge system impact and facilities studies, guide cost allocation and network upgrade decisions, and keep projects moving through evolving queue reform requirements. You’ll also partner closely with development, engineering and commercial teams, and present interconnection risk and strategy to senior leadership.
What We’re Looking For: A candidate with ten plus years of experience in generation interconnection, transmission planning or power system studies, ideally across utility, consulting and developer environments. You’ll have a proven track record of taking projects from interconnection request through LGIA or GIA execution, and a strong understanding of ISO and RTO interconnection procedures, FERC and NERC requirements, and queue reform. Hands-on experience with load flow, contingency, stability and short circuit analysis using PSS/E, PowerWorld or similar tools is essential. Established relationships with transmission providers, ISOs and utilities are a strong plus. A degree in electrical engineering is required, and an advanced degree or PE is preferred.

Before you apply

Applying takes about a minute. These four things decide how fast it moves after that.

Your profile is current

It's what we read first. Occupations, seniority and locations matter more than a long history.

Two examples you can talk through

Not a portfolio — just two pieces of work where you can explain the decisions and what you'd change.

A number in mind

What you're on now and what would make you move. We negotiate better when we know both.

Your notice period

Employers plan around it, and it's the question that stalls offers most often.

Once you apply, someone reads it and calls you before anything reaches the employer — usually within two working days.

More like this